CARIBOO GOLD MINE
Dub Electric has been a cornerstone of the Cariboo Gold Mine’s success, delivering innovative and reliable electrical solutions for a project that presented unique challenges. Located in Wells, BC, and formerly known as Barkerville Gold Mines, this site required customized approaches to accommodate unconventional equipment and softer ground conditions. Dub Electric’s meticulous planning, technical expertise, and commitment to safety have ensured that the project remained on schedule, within budget, and fully compliant with regulatory standards.
Client
Osisko Development
Duration
15 Months
Scope
Electrical systems design, power distribution, safety system
implementation, and ongoing operational support.
Impact
Delivered custom power distribution systems and ensured seamless operations in soft-ground conditions.
Project Challenges
Specialized Equipment Requirements
- Integration of the MT720 Sandvik road header, a large and highly specialized piece of equipment, posed significant challenges.
- The road header required 1000 volts AC, an uncommon voltage in British Columbia,
necessitating innovative electrical engineering. - The equipment’s size prevented the use of a cable reeler, requiring unique logistical solutions to ensure consistent power delivery
Unique Site Condition
- The softer ground conditions at Cariboo Gold Mine required a different approach compared to traditional hard rock mining. This added complexity to the design and implementation of electrical and ventilation systems.
Safety Standards Compliance
- The underground nature of the project demanded robust emergency and safety systems, as well as compliance with stringent mining regulations.
Role & Contributions
Costumer Power Distribution Solutions
Dub Electric engineered a tailored electrical distribution system to accommodate the MT720 Sandvik road header’s non-standard voltage and power delivery needs. This innovation ensured seamless equipment operation, eliminating potential downtime.
Ventilation System Design and Support
Collaborating closely with JDS Mining, Dub Electric helped design ventilation systems to maintain proper airflow and mitigate risks in the underground environment.
Emergency System Implementation
Dub Electric installed emergency electrical systems, including backup power and fail-safe measures, to enhance worker safety and meet compliance standards.
Ongoing Electrical Support
The team continues to provide maintenance, planning, and operational support, ensuring the Cariboo Gold Mine remains a benchmark for efficiency and safety in mining projects.
Results & Outcome
Operational Excellence
Dub Electric engineered a tailored electrical distribution system to accommodate the MT720 Sandvik road header’s non-standard voltage and power delivery needs. This innovation ensured seamless equipment operation, eliminating potential downtime.
Enhanced Safety Standards
Proactive planning and adherence to electrical codes minimized risks, creating a safer work environment.
Client Trust and Collaboration
The ongoing partnership reflects JDS Mining’s confidence in Dub Electric’s ability to address complex project needs and deliver exceptional results.