ASCOT PREMIER GOLD MINE

Dub Electric Ltd. played an integral role in the success of the Ascot Premier Gold Mine project by providing comprehensive electrical solutions tailored to the mine’s unique operational challenges. From electrical design and planning to ongoing operational support, Dub Electric showcased its expertise in addressing the site’s remote location, extreme snowfall, and reliance on off-grid power. This case study highlights the innovative approaches, technical excellence, and long-term impact of Dub Electric’s contributions to this flagship project.

Client

Ascot Resources

Duration

16 Months

Scope

Electrical system design and planning, power generation, installation of
electrical infrastructure, and ongoing operational support.

Impact

Optimized electrical infrastructure and ensured reliable performance in challenging high-altitude conditions.

Project Challenges

Harsh Environmental Conditions

Heavy snowfall and extreme cold required robust electrical systems capable of withstanding
adverse weather.

Off-Grid Power Supply

The absence of hydro power at the site necessitated innovative power generation solutions to support critical mine operations.

Scalability and Future-Proofing

Electrical infrastructure needed to meet immediate demands while allowing for future
equipment upgrades and expansions.

Role & Contributions

Electrical Design and Planning
  • Designed resilient electrical systems to operate efficiently in extreme weather conditions.
  • Developed power generation strategies that compensated for the lack of hydro power,
    ensuring reliable operations.
  • Created scalable infrastructure to accommodate future growth and equipment needs.
Electrical Building Design and Installation
  • Conceptualized and built a state-of-the-art electrical building to house critical systems, ensuring accessibility and protection from environmental hazards.
  • Installed heating and ventilation systems to support the mine’s operational requirements in harsh climates.
  • Delivered power generation systems with minimal downtime, enabling seamless operation.
Comprehensive Power Generation Solutions
  • Managed all aspects of power generation, from setup to maintenance, ensuring uninterrupted operation of critical mine functions.
  • Integrated systems to support heavy equipment operation, heating, and ventilation needs.
Long-Term Operational Support
  • Provided post-project optimization and support for refining and enhancing the mine’s electrical systems.
  • Engaged by Ascot for a seven-year electrical system design plan, ensuring the mine’s power infrastructure continues to meet evolving needs.

Results & Outcome

Operational Resilience

Successfully implemented systems capable of operating in extreme weather conditions and
off-grid scenarios.

Future-Proof Infrastructure

Designed electrical solutions to support future expansions and equipment upgrades, ensuring long-term project viability.

Client Confidence

Ascot Resources’ repeated engagement of Dub Electric underscores their trust in the
company’s expertise and reliability.

Improved Efficiency

Optimized power systems for reliable and cost-effective operation, supporting critical mine functions without interruptions.

Key Takeaways

Innovation in Adverse Conditions

Dub Electric’s ability to deliver reliable systems in a remote, off-grid location demonstrates
their ingenuity and adaptability.

Sustainability and Scalability:

Future-proof designs ensure that Ascot Resources can meet both current and future
operational demands.

Client Loyalty

Continued collaboration with Ascot and other mining companies highlights Dub Electric’s
reputation for delivering quality results.